Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Sussman |
Model Number : | SS-DL |
Certification : | CCC, SGS, ISO9001, CE |
Price : | negotiable |
Payment Terms : | L/C, T/T, Western Union |
Supply Ability : | 10 sets per month |
Delivery Time : | Shipped in 60 days after payment |
Glazed tile roll forming machine
Technical Parameter
Item NO. | Description | Offered specification |
1 | Forming speed | 15 M/ Min |
2 | Material thickness | 0.25--0.8mm |
3 | Raw material | Colour galvanized coils |
4 | Dimension | 8000*1700*1500mm about |
5 | Levelling device | 7 roller levelling including 3 top rollers and 4 bottom rollers |
6 | Roller stations | 16 stations |
7 | Roller material | bearing steel, quenching treatment |
8 | Shaft diameter | Φ75mm ,material is 45# forge steel |
9 | Transmission | By chain 1 inch 20A double chain with longer shafts |
10 | Material of chain | 45# forged steel with frequency quenching, 12A |
11 | Material of cutting | Cr12Mov with quench HRC58-62° |
12 | Main motor power | 7.5kw |
13 | Motor power of hydraulic station | 4kw |
14 | Hydraulic station pressure | 12Mpa |
15 | Tolerance | 6m+-1.5mm |
16 | Frame | H Beam |
Main Components
Serial No. | Commodity & Description | Quantity |
1 | 5T manual uncoiler | 1 set |
2 | Leveing guiding | 1 set |
3 | Servo feeding device | 1 set |
4 | Main roll forming machine | 1 set |
5 | Hydraulic station | 1 set |
6 | Cutting device | 1 set |
7 | Finished products tabel | 1 set |
8 | PLC control system | 1 set |
9 | Out tables | 2 sets |
10 | Spare parts | 1 set |
Machine Working Flow
De-coiler—→Level device —→Main roll forming machine—→Hydraulic cutting—→ Run out table
Main Profile Drawing of Product
After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
![]() |