Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | SUSSMAN |
Model Number : | SS-PU |
Certification : | SGS. ISO, CE |
Price : | negotiable |
Payment Terms : | L/C, T/T, |
Supply Ability : | 10 sets per month |
Delivery Time : | 60 working days after deposit |
PU Shutter Door Roll Forming Machine
Technical Data
1. Steel Sheet Thickness: 0.3-1.2mm (depend on requirement )
2. Cutting: fly saw cutting
3. Transmission way: chain
4. Material of blad: Cr12, quenching treatment
5. Capacity of Decoiler: 3 ton hydraulic decoiler
6. Forming Speed: 8-15m/min
7. Roller Groups: 38 stations
8. Roller Material: GCr15 grade steel, quenching treatment
9. Material: color-coated galvanized steel
10. Principal Axis: 45# high grade steel with quenching treatment
11. Main Motor Power: 11 Kw
Production Line Machine List
Serial No. | Commodity & Description | Quantity |
1 | 3T manual uncoiler | 1 set |
2 | feeding guiding | 1 set |
3 | Main roll forming machine | 1 set |
4 | Output table | 1 set |
5 | Main drive gear box | 1 set |
6 | Fly saw cutting | 1 set |
7 | Controlling system (including cabinet) | 1 set |
8 | Water cooling system | 1 set |
9 | Cassette | 2 sets |
Advantage of machine
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
Standard Profile :
Working Flow
A.Passive
Decoiler..........................................................To
load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the
heavy material.)
B.Servo Feeding
Applicator............................................To feed the
material accurately
C.Hydraulic/Press
Punching...........................................To punch as
requirements
D.Roll Forming
Unit.........................................................To
roll form as requirements
E.Hydraulic
Cutting.........................................................To
cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F.Output Table................................................................Support the finished products
Uncoiling – feed Guiding–Roll forming ––fly saw cutting – Run-out table
Photo Gallery
After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
Loading pictures
![]() |